Hitachi 650TLX Operator's Manual
Size: 39.8 MB
Machine: Hydraulic Crawler Crane
Machine Model: 650TLX
Serial Number: SC65T-8022 and up, SC65T–8045 and up
Content:
Hitachi 650TLX Operator's Manual RGA90-EN-CR-00-005 522 pages 2017
Hitachi 650TLX Operator's Manual RGA90-EN-CR-00-013 540 Pages 2021
The Bookmarks of Hitachi 650TLX Hydraulic Crawler Crane Operator's Manual: INTRODUCTION
1 Introduction
1 Introduction
2 Safety Signs
2 Safety
1 Basic Precautions
2 Preparations For Safety Operation
3 Precautions For Operation
4 Precautions For Preparation Of Operation And Transportation
5 Precautions For Maintenance
3 Components Name And Function
1 Major Component Locations
2 Operator’S Station Layout
3 Control Levers And Pedals
4 Control Panels
5 Monitor Panel
6 Operator’S Seat
7 Air Conditioner
8 Radio
9 Fuse Box
10 Level Gauge
11 Sound Output Unit
12 Safety Devices
13 Anti-Two Block
14 Moment Umiter
15 Display Of Error Codes
16 Swing Alarm Ught
17 Alarms And Advance Notice Device
18 3 Color Percentage Indicator Light
19 Handholds And Handrails
20 Remote Sensing (Data Logging Device)
4 Operation
1 Daily Machine Inspection Before Operation
2 Starting The Engine
3 Inspections And Operation After Starting Engine
4 Muffler Filter
5 Inspection, Setting, And Confirmation Of Moment Umiter
S Engine Speed Control
7 Operating Front And Rear Drum (Free Mode Is An Optional)
8 Third Winch Lever Operation
9 Drum Lock Operation (Front, Rear And Third Drums)
10 Boom Hoisting Operation
11 Boom Extend/Retract Operation
12 Swing Operation (Including Operations Of The Swing Brake And Lock)
13 Travel Operation
14 Hydraulic Power Source (Optional)
15 Clamshell Operation
16 Reeving Winch Cum Hydrauuc Tagline (Optional)
17 Vibratory Hammer Operation
5 Assembling
1 Preparation And Precautions
2 Assembly Procedure
3 Unloading The Crawler From The Trailer
4 Unloading Base Machine From Trailer
5 Installing Crawlers
6 Attaching The Boom
7 Connecting The Hydraulic Hose And Electrical Wirin Of The Boom
8 Drawing The Auxiliary Sheave
9 Attaching The Anti-Two Block Device
10 Install Hook And Wire Rope
11 Unloading Base Machine From Trailer (When The Jack Are Mounted)(Optional)
12 Attaching The Crawler (With Jacks)
13 Install Counter Weights
14 Attaching Self Assembly Counter Weights (Optional)
15 Unloading Base Machine Ftom Trailer (When The Crawler Are Mounted)
16 Extension Of Crawler
17 Installing Catwalk
18 Installing Reeving Winch Combined Hydraulic Tagline (Optional)
6 Disassembling
1 Disassembly Preparation And Precautions
2 Disassembly Procedures
3 Removing Reeving Winch Combined Hydraulic Tagline (Optional)
4 Removing Catwalk
5 Remove Counter Weights
6 Removing Self Assembly Counter Weights (Optional)
7 Removing Anti-Two Block Device
8 Storing The Auxilary Sheave
9 Detaching The Boom Hydraulic Pressure Hose And Electric Wiring
10 Removing Boom
11 Remove Crawlers
12 Loading Base Machine Onto Trailer
13 Removing Crawlers (When The Jack Are Mounted)
14 Loading Rase Machine Onto Trailer (With Jacks) (Optional)
15 Retract Width Of Crawlers
16 Loading Base Machine Onto Trailer (With Crawler)
17 Maintenance After Disassembly
18 Handling Wire Rope
19 Wire Rope Specifications And Lengths
20 Outline Of Wire Rope
21 General Wire Rope Handling
7 Transportation
1 Transportation On Public Roads
2 Weights And Dimensions List
8 Maintenance
1 Inspection And Maintenance
2 Periodic Replacement Parts
3 Inspection
4 Upper Structure Inspection
5 Inspection Of Swing Upper Structure Daily Or Every 8 Hours
6 Inspections Of Swing Upper Structure Weekly Or Every Loo Hours
7 Inspection Of Swing Upper Structure Monthly Or Every 150 Hours
8 Inspection Of Upper Structure Every 3 Months Or Every 250 Hours
9 Inspections Of Upper Structure Every 3 Months Or 500 Hours
10 Inspection Of Upper Structure Every 6 Months Or 1000 Hours
11 Inspection Of Muffler Filter Every 4500 Hours
12 Lower Structure Inspection
13 Inspections Of Lower Structure Daily Or Every 8 Hours
14 Inspections Of Lower Structure Monthly Or Every 150 Hours
15 Insoections Of Lower Structure Every 3 Months Or 500 Hours
16 Every 6 Months Or 1000 Hour Inspections Of Lower Structure
17 Inspection Of Front Attachment
18 Inspection Of Front Attachment Daily Or Every 8 Hours
19 Front Attachment Inspection Monthly Or Every 150 Hours
20 Maintenance
21 Lubricants, Greases, And Coolant
22 Kinds Of Lubricants
23 Lubrication (Coolant) Points On Swing Upper Structure
24 Lubrication Points On Lower Structure
25 Front Attachment Lubrication Points
26 Grease
27 Engine Oil
28 Fuel
29 Coolant
30 Hydraulic Oil
31 Gear Oil
32 Cleaning And Replace Filter Elements And Strainer
33 Check Electrical System
34 Maintenance For Machines Operating Under Severe Environmental Conditions
35 Storage
36 Adjustment
37 Adjust Front/Rear/Third Drums
38 Adjust Control Lever Detents
39 Adjust Shoe Sag
9 Specifications
1 Crane Specifications