Komatsu 830E-5 A50005-A50099 Field Assembly Manual CEAW008905 01
Size: 16.64 MB
Language: English
Machine: Dump Truck
Machine Model: 830E-5
Serial Number: A50005-A50099
Part Number: CEAW008905 01
Publication Date: 2024
Pages: 398 Pages
The Bookmarks of Komatsu 830E-5 A50005-A50099 Field Assembly Manual CEAW008905 01:
FIELD ASSEMBLY MANUAL 830E-5 DUMP
FOREWORD
TABLE OF CONTENTS
SAFETY RULES, TOOLS & EQUIPMENT
TRUCK COMPONENTS AND SPECIFICATIONS
Truck and Engine
AC Induction Traction Motorized Wheels
Suspension
Operator's Cab
Power Steering
Dynamic Retarding Grid
Brake System
Selective Catalytic Reduction (SCR)
Diesel Exhaust Fluid (DEF)
SPECIFICATIONS
MAJOR COMPONENT WEIGHTS
FIELD WELDING FOR ASSEMBLY OR REPAIR
WELDER QUALIFICATION AND TRAINING
WELD PROCEDURES
APPROVED CONSUMABLES
WELD QUALITY REQUIREMENTS
MATERIALS, CONTROLS, AND PRECAUTIONS
WELD INSPECTION
RECORDS
ANNEX A
ANNEX B
BIBLIOGRAPHY
SPECIAL PRECAUTIONS WHEN SERVICING AN AC DRIVE SYSTEM TRUCK
RECEIVING & ASSEMBLY PREPARATION
Preparation
Coded Boxes
ASSEMBLY LAYOUT
CHASSIS ASSEMBLY
DUMP BODY ASSEMBLY
GENERAL INFORMATION
BODY ASSEMBLY
BODY WELDING
FINAL ASSEMBLY
Body Pad Shimming Procedure
Miscellaneous Installations
FINAL CHECKOUT
APPENDIX
LUBRICATION CHART
STANDARD TORQUE CHARTS AND CONVERSION TABLES
SUSPENSION OILING AND CHARGING PROCEDURE
SUSPENSION OILING AND CHARGING BLOCK KIT INSTALLATION PROCEDURE
OIL AND NITROGEN SPECIFICATIONS CHART
ENGINE EMISSIONS AFTER-TREATMENT SYSTEMS
TOE-IN ADJUSTMENT
SEAT BELTS AND TETHERS CHECKOUT PROCEDURE
ELECTRIC CHECKOUT PROCEDURE
INTERFACE MODULE CHECKOUT PROCEDURE
ADDITIONAL ELECTRICAL CHECKOUT FOR TRUCKS WITH IM CONTROLS
HYDRAULIC CHECKOUT PROCEDURE
BRAKE TEST CHECKOUT PROCEDURE
BRAKE SYSTEM CHECKOUT PROCEDURE
PRE-SHIFT BRAKE TEST - TEST PROCEDURE
AUTOMATIC LUBRICATION SYSTEM
AUTO LUBRICATION SYSTEM CHECKOUT PROCUDURE
AIR CONDITIONING SYSTEM CHECKOUT PROCEDURE
TIRE MONITORING SYSTEM CHECKOUT PROCEDURE
PAYLOAD METER IV CHECKOUT PROCEDURE
ALTERNATOR TO ENGINE ASSEMBLY CHECKOUT PROCEDURE
ALTERNATOR LOCK CHECKOUT PROCEDURE
KOMTRAX PLUS 2 SHOP SETUP PROCEDURE
KOMTRAX PLUS 2 SITE SETUP PROCEDURE
KOMVISION® CHECKOUT PROCEDURE
KOMATSU WIRELESS BRIDGE CHECKOUT PROCEDURE
RETRACTABLE LADDER SYSTEM CHECKOUT PROCEDURE
FIELD ASSEMBLY INSPECTION REPORT
50 HOUR POST-COMMISSIONING CHECKSHEET
#More Product: Komatsu Operators, Parts, Shop Manual and Wiring Diagram 2024