Komatsu 830E-5 A50154-A50173 Field Assembly Manual CEAW012201 01
Size: 17.64 MB
Language: English
Machine: Dump Truck
Machine Model: 830E-5
Serial Number: A50154-A50173
Part Number: CEAW012201 01
Publication Date: 2024
Pages: 394 Pages
The Bookmarks of Komatsu 830E-5 A50154-A50173 Field Assembly Manual CEAW012201 01:
FIELD ASSEMBLY MANUAL 830E-5 DUMP
FOREWORD
TABLE OF CONTENTS
SAFETY RULES, TOOLS & EQUIPMENT
TRUCK COMPONENTS AND SPECIFICATIONS
Truck and Engine
AC Induction Traction Motorized Wheels
Suspension
Operator's Cab
Power Steering
Dynamic Retarding Grid
Brake System
Selective Catalytic Reduction (SCR)
Diesel Exhaust Fluid (DEF)
SPECIFICATIONS
MAJOR COMPONENT WEIGHTS
RECEIVING & ASSEMBLY PREPARATION
Preparation
Coded Boxes
CHASSIS ASSEMBLY
DUMP BODY ASSEMBLY
GENERAL INFORMATION
BODY ASSEMBLY
BODY WELDING
FINAL ASSEMBLY
Mount Tires, Rim Adapter, and Torque
Rear Wheel Installation
Body
Body Pad Shimming Procedure
Rock Ejectors
Mud Flaps
Guide Brackets
Retention Sling
Body Up Switch Adjustment
Hoist limit switch adjustment
Bolt in Lubrication System
Isolation Box Installation
Camera and Radar
FINAL CHECKOUT
APPENDIX
STANDARD TORQUE CHARTS AND CONVERSION TABLES
SUSPENSION OILING AND CHARGING PROCEDURE
SUSPENSION OILING AND CHARGING BLOCK KIT INSTALLATION PROCEDURE
OIL AND NITROGEN SPECIFICATIONS CHART
FAN CLUTCH CHECKOUT PROCEDURE
ENGINE EMISSIONS AFTER-TREATMENT SYSTEMS
TOE-IN ADJUSTMENT
SEAT BELTS AND TETHERS CHECKOUT PROCEDURE
ELECTRIC CHECKOUT PROCEDURE
INTERFACE MODULE CHECKOUT PROCEDURE
ADDITIONAL ELECTRICAL CHECKOUT FOR TRUCKS WITH IM CONTROLS
HYDRAULIC CHECKOUT PROCEDURE
Brake Test Pre-Shift Checkout Procedure
BRAKE SYSTEM CHECKOUT PROCEDURE
AUTOMATIC LUBRICATION SYSTEM
AUTOMATIC LUBRICATION SYSTEM CHECKOUT PROCEDURE
AIR CONDITIONING SYSTEM CHECKOUT PROCEDURE
TIRE MONITORING SYSTEM CHECKOUT PROCEDURE
PAYLOAD METER IV CHECKOUT PROCEDURE
ALTERNATOR LOCK CHECKOUT PROCEDURE
KOMTRAX PLUS 2 SHOP SETUP CHECKOUT PROCEDURE
KOMTRAX PLUS 2 SITE SETUP CHECKOUT PROCEDURE
KOMVISION® CHECKOUT PROCEDURE
KOMATSU WIRELESS BRIDGE CHECKOUT PROCEDURE
RETRACTABLE LADDER SYSTEM CHECKOUT PROCEDURE
FIELD ASSEMBLY INSPECTION REPORT
50 HOUR POST-COMMISSIONING CHECKSHEET
#More Product: Komatsu Operators, Parts, Shop Manual and Wiring Diagram 2024