Komatsu PC3400-11M0 Field Assembly Instructions GEN00237-00
Size: 34.2 MB
Machine: Hydraulic Excavator
Machine Model: PC3400-11M0
Serial Number: 36301 and up
Pages: 299 Pages
Form Number: GEN00237-0
The Bookmarks of Komatsu PC3400-11M0 Hydraulic Excavator Field Assembly Instruction:
Cover
1 Foreword
2 Safety
2.1 Safety Information
2.2 Overview
2.3 Sound Pressure And Vibration Levels In The Operator’S Cab.
2.4 General Precautions Common To Operation On The Excavator
2.5 Precaution For Maintenance
2.6 Additional Safety Information For Troubleshooting And Adjustments
2.7 Special Safety Equipment
3 General
3.1 General
3.2 Assembly Site Requirements
3.3 Standard Application For Torque Chart
3.4 Special Tightening Torques
3.5 Torque For Flange Joints
3.6 Tightening Torque For Hydraulic Hose Connecting Nut
3.7 General Installation Procedures For Hydraulic Hose Lines
3.8 General Installation Instructions For Attachment Pins
3.9 Transportation Postures
4 Assembly Sequence
4.1 Assemble Sequence
4.2 Assemble The Undercarriage (Center Body, Track Frames)
4.3 Assemble The Main Valve Block Assembly
4.4 Assemble The Superstructure Platform
4.5 Assemble The Machine House Assembly
4.6 Assemble The L.H. Platform
4.7 Assemble Hydraulically Operated Stairway
4.8 Assemble The Machine House L.H. Platform
4.9 Assemble The Cab Base
4.10 Assemble The Operator’S Cab
4.11 Assemble The Fuel Tank Top Platform
4.12 Assemble The Lubrication Pump Station
4.13 Assemble The Hydraulic Od Tank
4.14 Assemble The Superstructure Floor Frame
4.15 Assemble The Machine House R.H. Platform
4.16 Assemble The Hydraulic Od Tank R.H. Platform
4.17 Assemble The Emeraencv Escaoe Ladder At The Machine House
4.18 Assemble The Od Cooler Assembly
4.19 Pre-Assemble Boom & Hydraulic Cylinder
4.20 Assemble The Counterweight
4.21 Install The Pre-Assembled Boom At The Superstructure
4.22 Connect The Components And Piping Around The Boom Foot
4.23 Pre-Checks Before Engine Start
4.24 Install The Stick At The Boom
4.25 Connect The Stick Cylinders And Stick
4.26 Connect The Components And Piping Around The Stick
4.27 Bleeding The Bucket Cylinder
4.28 Assemble The Bucket
4.29 Bleed Air From Track Tensioning System
4.30 Bleed Slew Circuit
4.31 Bleed Air From Track System
5 Disassembly Of The Excavator
5.1 Disassembly Sequence Of Backhoe Excavators
6 Final Checks And Adjustments
6.1 Commissioning Check List
6.2 Adjustment Of Automatic Lubrication Systems
6.3 Charging Air Conditioner With Refrigerant
6.4 Perform The Pm - Clinic Commissioning Procedure According To The Pm - Clinic Manual
6.5 Handling Of Documentation After Assembly And Commissioning
7 Orbcomm Initialization
7.1 Pc Configuration Tool For Komtrax Plus / Orbcomm
7.2 Komvision Calibration