Komatsu PC48000E-6 Operation & Maintenance Manual GZEAM12086
Machine: Hydraulic Mining Shovel
Machine Model: PC48000E-6
Serial Number: 12086
Pages: 580 Pages
Form Number: GZEAM12086
The Bookmarks of Komatsu PC48000E-6 Hydraulic Mining Shovel Operation & Maintenance Manual:
1 Foreword
1.1 Before Reading This Manual
1.2 Ec Declaration Of Conformity
1.3 Privacy Policy On Machines Equipped With Machine Monitoring Systems
1.4 Radio Wave Regulations For Komtrax And Komtrax Plus
1.5 Directions Of The Machine
1.6 Specification And Serial Plate
1.7 Division Of The Binder
1.8 Designated Use Of The Shovel
1.9 Delivery Of The Shovel
1.10 Explanation Of Abbreviations
2 Safety
2.1 Safety Information
2.2 Overview
2.3 Sound Pressure And Vibration Levels In The Operator’S Cab.
2.4 General Precautions Common To Operation On The Excavator
2.5 Precaution For Maintenance
2.6 Additional Safety Information For Troubleshooting And Adjustments
2.7 Special Safety Equipment
2.8 High Voltage Safety Instructions For Machines With Electric Motor
2.9 Safety Warning Signs
3 Operation
3.1 Foreword
3.2 Construction Of The Shovel
3.3 Operator’S Cab - Controls
3.4 Kontrax Plus— Vehicle Health Monitor
3.5 Camera System With Monitors (Special Equipment)
3.6 Operating The Heater, Ventilation And Air Conditioning
3.7 Machinery House
3.8 Medium Voltage Switch Cabinet In Cab Base
3.9 Preheating System
3.10 Checks Before Starting The Motors
3.11 Starting The Main Drive Motors
3.12 Moving The Shovel
3.13 Slewing And Braking The Superstructure
3.14 Working With The Attachment
3.15 Working Instructions
3.16 Parking The Shovel
3.17 Parking The Shovel
3.18 Stopping The Main Drive Motors.
3.19 Operation Of The Lubrication System
3.20 Fire Detection, Actuation And Suppression System.
3.21 Transfer Pump For Hydraulic Oil
3.22 Central Refilling System
3.23 Service Crane (Special Equipment)
3.24 Cable Drum (Special Equipment)
3.25 Cable Guide (If So Equipped)
3.26 Work On The Loader Attachment
3.27 Transportation And Lifting Of The Shovel
3.28 Retrieval Procedure
3.29 Shovel Storage
3.30 Trouble Shooting
4 Maintenance
4.1 Foreword
4.2 Precautions For Maintenance
4.3 Fluids And Lubricants
4.4 Filling Capacities
4.5 Standard Torque List
4.6 Lubrication And Maintenance Schedule
4.7 Safety Critical Parts
4.8 First Servicing
4.9 When Necessary
4.10 Every 10 Operating Hours Or Daily
4.11 Every So Operating Hours Or Weekly.
4.12 Every 250 Operating Hours Or Monthly
4.13 Every 500 Operating Hours Or Monthly
4.14 Every 1000 Operating Hours Or Every 6 Month
4.15 Every 2000 Operating Hours Or Yearly
4.16 Every 3000 Operating Hours However At Least Once A Year
4.17 Critical Bolt Connections - Every 3000 Operating Hours
4.18 Every 6000 Operating Hours Or Once A Year
4.19 Fire Prevention
4.20 Weld Repairs